Shanxi Changzhi project

   

Shanxi Changzhi steel and iron (group) limited company


From 20th Nov, 2006 to 15th July, 2007, "CREG" (group) limited company set of a TRT system for the 8# 1080m3 blast furnaces disposes and installs electric power facility which is coal gas -odd to press the turbine.


And is responsible to invest, design, construction, operation, the arrangement form and the main engine shaping are consulted and determined by both sides. The technical shaping adopts the domestically advanced level. This technology is certainly not having the negative influence to the Shanxi Changzhi steel and iron.


"CREG" begins the construction on this project on December 1, 2006, and this project finished on July 10, 2007. And goes into production the electricity on July 18, 2007, the yearly rate is 49.38 million /KW. This project has operated successfully and creates great economic benefit for the Shanxi Changzhi steel and iron